OpenAI, Oracle, and Related Digital plan a $7B data center campus in Michigan, promising thousands of jobs, DTE-backed power, and a LEED closed-loop design.
Open enrollment doesn’t have to be an annual fire drill. With an emphasis on ownership, it can be a predictable process that drives trust.